Athletic Center Update: October 2007
We are in the final stages of construction on The Mitchell Swaback Athletic Center. There have been some delays with the humidity in the building. Until the humidity gets down to a certain level the wood floors cannot be installed. The good news is the wood floors are on the job site and the concrete floors in lobby area have been stained. The concession area cabinets and fixtures are completed, acoustical ceiling have been installed as well as the lockers in the locker room. A rubber floor is being installed on the mezzanine level before all the workout equipment is delivered. We look forward to dedicating this new center in approximately one month!