Casa de Esperanza: September 2010 Update
What a difference some drywall and paint can make! As September wraps up, so are we in completing the Casa de Esperanza!
The walls are painted, the bathroom ceramic is completed and the wood floors are waiting for final sanding and sealing.
We would like to thank our new friend Adrian Cozariuc from A&R Flooring and Remodeling for coming along side and helping us with the floors. We met Adrian on the first day of this project when the demolition took place. Adrian never stopped working that day and came to us at the end and said he would like to donate all of the labor to repair the sub floors and install the hardwood floors.
As you can tell by the pictures Adrian went above and beyond the call of duty. Adrian took the time to cut custom in lays into the floors which once finished will look amazing! By going this extra effort this won’t finish up as just a newly renovated home, it will be an impressive newly renovated home and a blessing to all that move in!
MSC thanks Adrian for his great work!
Within the next few weeks the kitchens, doors, trim and window coverings will be completed with new tenants scheduled to move in sometime in November!