Casa de Esperanza: June 2010 Update
Construction is starting to pick up speed after a slow start. To date, the following items have been completed:
- The new windows have been installed.
- All of the existing window sills were sandblasted back to their original finish.
- The rear porch posts have been set.
- The rear of the existing building was striped of the existing plaster.
- The original brick was tuck pointed.
Starting in July, we'll have the rough work going in for the electrical, plumbing and heating and air conditioning.
We continue to be blessed by the work that is being accomplished and all those involved in this process.